Current location - Education and Training Encyclopedia - Graduation thesis - What are the evaluation conditions for the title of surveying and mapping engineer?
What are the evaluation conditions for the title of surveying and mapping engineer?
A, surveying and mapping engineering intermediate title evaluation conditions

1, obtained a doctorate, engaged in professional and technical work, and worked for 6 months.

2, master's degree, assistant engineer, and then engaged in this professional and technical work for more than 2 years.

3. After graduating from a postgraduate class or obtaining a double bachelor's degree and obtaining the qualification of assistant engineer, he has been engaged in this professional and technical work for more than 4 years.

4, graduated from the university, after obtaining the qualification of assistant engineer, engaged in the professional and technical work for more than 4 years.

5. After graduating from junior college and obtaining assistant engineer, he has been engaged in professional and technical work for more than 4 years.

6, graduated from technical secondary school, unable to declare intermediate titles, need to study college degree or above.

Second, the employment prospects of surveying and mapping engineers

Surveying and mapping engineers are engaged in engineering surveying and scientific research in the system and scientific research units of the Bureau of Surveying and Mapping, and in surveying, construction and operation in various engineering construction departments (electric power, water conservancy, urban construction, military, energy, transportation, etc.). ) and related industrial and mining enterprises (such as metal mines, petroleum, geology, coal, etc.). ).

The positions available are: civil engineer, civil engineer, surveyor, surveying engineer, mechanical engineer, surveying engineer, builder, gis development engineer, technical support engineer, sales engineer, surveying surveyor, project manager, etc.

Three, surveying and mapping engineer title level:

The titles of surveying and mapping engineering are divided into three grades from low to high: assistant surveying and mapping engineer (junior title), intermediate surveying and mapping engineer (intermediate title) and senior surveying and mapping engineer (senior title).

Four. Requirements for social security materials

Social security materials are necessary to participate in the audit, and social security needs to be paid in the work area for more than half a year.

Verb (abbreviation of verb) Requirements for paper title

The evaluation of intermediate titles in surveying and mapping engineering needs to publish a paper and a professional technical report in professional journals with CN and ISSN numbers.

Note: the title of the paper should be found in the copy of HowNet. Pay attention to the repetition rate of published papers! It is best to control it below 30%. Some regions or jury have requirements to publish 2 papers, subject to local specific requirements.

Six, continuing education requirements

Applicants for professional titles need to complete 90 hours of continuing education. If you don't have enough hours, you can go to continuing education bases or institutions in various regions to study.

Seven, professional title performance requirements

Take construction as an example, such as: project bid-winning notice, commencement report, project feasibility study report, project construction contract, sub-project acceptance sheet, sub-project acceptance data, unit certificate or letter of appointment, project construction organization design scheme, engineering drawings, etc. A complete project performance material is calculated from the beginning to the end of the project.

The achievements include not only the letter of acceptance, the construction contract, the completion acceptance report, but also your scientific research achievements, papers, national patents, and the honors obtained by participating in engineering construction projects. It is enough to provide 3-5 titles and performance materials in quantity, but remember to seal the company!