In the daily maintenance of public works, the rope alignment method is used to adjust the curve direction, and the planned normal vector may be revised twice in the distribution calculation. The purpose of the first revision is to ensure that the distribution at the end of the curve is zero; The purpose of the second modification is to reduce or zero the dialing volume of some control points as much as possible.