What are the survey projects of low-voltage industrial expansion projects?
Low voltage side sequence; Switch screen, metering screen, compensation screen and load screen (cabinet); There are several load circuits connected with several switches, and small circuit switches can be designed in a cabinet. Pay attention to the design of several backup switches.
In order to expand the capacity in the future, you can design a spare screen with nothing in it.