Supervision Tester 1 Work Summary I. Work Situation
Just arrived at the construction site, in a different place, but faced with objective unfavorable factors such as large supervision tasks, wide supervision area and few supervision personnel. So I did encounter some difficulties in the actual supervision work. I didn't flinch in the face of difficulties, and I made progress despite all the difficulties. In practical work, I actively communicate with the owners and contractors to coordinate various relationships, so as to carry out supervision work as soon as possible, and take the time to familiarize myself with the construction drawings and related design instructions. In the shortest possible time,
In the actual supervision work, I require the construction unit to implement total quality management, establish and improve the quality assurance system, and make reports on commencement, construction measures, technical disclosure, positioning review, material and equipment inspection, concealed works, quality inspection, special inspection and completion data. In the aspect of engineering quality control, we should combine active control with passive control, actively carry out supervision work, and focus on prevention. Review the contractor's qualification, focusing on the enterprise registration certificate and technical level, submitting relevant documents (copies), understanding the general situation of technical force, main building installation experience, etc. , and check the supply of sand, stone, cement, steel and the mixture ratio of concrete and mortar.
According to the characteristics of the project and the key parts that affect the quality of the project, review the construction organization design submitted by the contractor, put forward improvement suggestions in view of its shortcomings, and check the original vouchers, test reports and other quality certification documents of the purchased materials. Control in advance to ensure that engineering quality accidents do not occur or occur less. Such as winter construction, low temperature, concrete pouring, masonry, wall plastering and other quality problems. It is not easy to guarantee. Therefore, the construction unit is required to provide a winter construction plan to prevent in advance and avoid freezing injury. For important engineering parts and subdivisional works prone to quality problems, quality pre-inspection measures shall be formulated. For example, in the concrete pouring project of civil engineering, the leveling of beam is a key part of the project, which involves many processes such as wall masonry, formwork, steel bar binding, concrete pouring and so on. Once negligence may cause engineering quality accidents, once quality problems occur, the consequences will be serious. Therefore, in this part of the construction, strengthen monitoring, take on-site supervision measures, and strictly supervise the construction of various parts, which will affect the construction quality. Strengthen process control. During the construction supervision of Wujin Jian 'an Construction Team, it was found that there were quality problems in the building material fly ash bricks used by the team. Although the contractor has a laboratory quality inspection report, in the attitude of being responsible to the owner, the batch of bricks are sampled by parallel inspection in time, and the construction unit is allowed to use it only after all the strength indexes are determined to meet the design requirements. There are also quality problems in concrete pouring, masonry and wall plastering. In order to ensure the construction quality, I issued a supervision notice in time, requiring the construction unit to repair the defective parts to meet the quality standards required by the design and specifications.
In the supervision work, the construction unit is required to carry out the construction according to the design content, design requirements and construction acceptance specifications to ensure the construction quality. In the construction of each working procedure, the construction unit is required to strictly implement the national and local construction and installation quality inspection system, check and confirm the relevant construction quality statements submitted by the construction unit in time, and review and sign the completed project quantities declared by the contractor according to the design documents and the provisions on the calculation of quantities in the contract. Supervision record is an indispensable part of engineering supervision. I have a complete and sufficient supervision diary, which records the relevant situation of the construction site every day in detail, providing a reliable basis for solving the dispute between the owner and the contractor fairly. During the supervision of the three construction sites, I actively coordinated the relationship between various units, making them cooperate with each other, support each other, and do a good job of cohesion to ensure the construction quality and progress. Through the above work, I completed the supervision of the workshop office building project of Tian Li Turbocharger Equipment Co., Ltd., the workshop office building project of Changzhou Yamazaki Motorcycle Equipment Co., Ltd. and the civil engineering project of Zhongdi Electric Co., Ltd., and gained a lot in three months' supervision, but there are still some shortcomings. For example, I am an environmental engineering major, and I don't know much about the professional knowledge of civil engineering, and some process requirements are not very familiar. However, the supervision industry requires supervision engineers to have rich knowledge in many disciplines and industries, so I need to continue to study hard in various disciplines and constantly improve my professional ability and level.
Second, some suggestions.
1. Strictly implement supervision procedures. At present, the on-site supervision work is not completely carried out in accordance with the supervision procedures, such as design disclosure, blue prints.the design, the first site meeting, introducing the supervision engineer and supervision contents to the owners and contractors, making supervision plans and supervision details, etc., and it is not carried out in accordance with the supervision procedures or only partially in accordance with the supervision procedures, resulting in practical problems such as no one cares, does not know the scope and how to supervise after the supervision engineer arrives at the site. In order to avoid the recurrence of such problems in the future supervision work, it is necessary to strictly implement the project construction supervision procedures, so that the supervision engineer can clearly understand the supervision tasks and basis and do a good job in supervision.
2. Improve the organizational structure of the project supervision department. Project supervision institutions are fully staffed, with clear responsibilities of chief supervision engineers, professional supervision engineers and supervisors, and complete communication and transportation facilities. Due to the long route and wide area of municipal engineering supervision, only convenient transportation can ensure the inspection and on-site supervision of each construction section, so that there will be no mistakes in the supervision work and the quality of the supervision work will satisfy the owner.
3. Carry out supervision personnel training, improve the quality of all staff, strengthen supervision personnel training, organize employees to seriously study the Supervision Code and Changzhou Local Engineering Construction Supervision Regulations, unify supervision standards, participate in various classes held by the Municipal Construction Committee and the Quality Supervision Station, master new policies and standards, and lay a good foundation for supervision work. The above is a summary of my supervision work in the past three months. Because of my short working time in the company, some problems may be one-sided, and there are still many shortcomings in my work. Please ask the company leaders and colleagues to make more corrections in their future work.
Third, the internship experience
The intense three-month internship life is over, and I still have a lot of gains in these three months. It is necessary to sum up after the internship.
Through more than three months of internship and practice, I have learned a lot of practical knowledge. The so-called practice is the only criterion for testing truth. Through practice, I have closely observed the whole construction process and learned a lot of applicable and specific construction knowledge, which I seldom contact and pay attention to at school, but it is very important and basic. While studying and practicing many specific construction methods in and out of class, I also have a more real and in-depth understanding of many specific construction details and management processes. Construction project is the construction process and achievement of a building product by the production object of a building construction enterprise, which can be the construction of a building project, or the construction of a single project or a unit project. Its main features are: first, the construction task of building projects or single projects or unit projects; Second, the enterprise construction enterprise is the main body of management; Third, the scope of the task is determined by the project contract.
Construction project management includes the following aspects: 1. Organization and management of construction projects; Second, the construction quality management; Third, the cost management of construction projects; Four. Safety production and civilized construction management of building engineering. To manage a project well, we need to control the specific construction steps from all aspects. The management experience and practices mentioned above are all obtained by combining knowledge learning with construction site work in recent years. College life is tense and full of expectations. In my spare time, I always look forward to packing my bags, staying away from my relatives and friends and teachers, and going my own way. However, when we can finally leave the nest built for us by our elders like fledgling eagles and step onto the big stage of social work alone, we find that the road of life is so bumpy that anyone's success has experienced some storms.
During the short three-month internship, I learned a lot. I continued to work hard and study in the society, adjusted my mentality, changed from a passive state when I first started social work to an active state when I started to adapt to society, and continued to devote myself to intense work with a relaxed mood and abundant energy. This internship made me deeply realize that reading is a way to increase my knowledge and broaden my horizons, but it is also an excellent choice to improve my comprehensive quality through more practice, being in the middle of practical things, touching the pulse of society and setting a position for myself. The school arranged an internship to learn practical knowledge in the big school of society. This is also my first real contact and feeling with society. I am very happy to come to Changzhou Cheng Zhen Supervision Company, and I am honored to meet these masters to take me, give me knowledge and help in my work, let me fully combine theory and practice in practice, and make clear my future development direction. Although I encountered some obstacles such as language at the beginning of my internship, I made myself more aware of my shortcomings, studied hard, worked hard and actively faced every new opportunity.
Summary of supervision and testing personnel's work II. Main work contents of personal year
This year, I mainly participated in the first phase of customs clearance project of Yantai Port Bonded Port Area, the general survey of underground pipelines in Yantai City, the restoration project of three jetty yards in Yantai Port, the displacement observation of the comprehensive building and the measurement of several projects of the company.
Second, perform job responsibilities
In this year's work, I still carry out all kinds of work with the attitude of working and learning, sum up the process and main points of each work, find out the problems I don't understand, consult the instructions and consult my leading colleagues in time, and accumulate work experience bit by bit.
In terms of engineering quality, strict supervision shall be carried out in accordance with supervision specifications, engineering drawings and supervision rules. When I participated in the customs clearance project in the bonded port area, I was on the scene most of the time. The project seems simple, but the site is very large, and many points are constructed at the same time. We must grasp the key points of supervision to reduce workload and improve work efficiency and effectiveness. If problems that cannot be solved are found, report to the project leader in time and consult relevant specifications. While solving the problem, I also filled my knowledge gap in this field, and I can solve it independently in the next similar situation. The parts that need to be on site should be on site all the time, and the site records should be made well. The concealed works to be accepted should be accepted in strict accordance with the acceptance specifications. If the acceptance is unqualified, the construction of next working procedure is strictly prohibited. Check and confirm the original certificate test report and quality certificate of materials and equipment entering the site, and witness the sampling and parallel test of steel bars and interlocking blocks. For projects with overlapping operations, coordinate the construction sequence of each construction unit on site and strive to be the best. At the end of each month, the site construction situation will be checked with the construction plan. If the progress is backward, the construction unit will be required to take measures to speed up the construction on the premise of ensuring the quality.
In terms of engineering data, supervision diaries are written every day according to the site conditions, and the site records and other data of that day are sorted and filed, and the construction unit is urged to report the corresponding engineering data. Regularly organize and archive witness sampling, parallel detection and other data, and make various accounts so as to prepare and archive the data at the end of the project.
Third, work experience, feelings and shortcomings
Through this year's supervision work, I feel that as a supervisor, only by following the rules, being strict with myself, integrating into the team, respecting others and being serious and responsible can I win the respect of others. I was exposed to many new things at the construction site. With the careful guidance and help of my old colleagues, I have learned a lot of new theoretical knowledge and practical experience and broadened my knowledge. In this year's work, I have gained a lot, but there are also many shortcomings, such as lack of work experience, lack of care and patience in the face of intense work, which also leads to many flaws in my work. In the future work, I will study hard, constantly sum up experience, learn lessons, correct my own shortcomings, and strive to foster strengths and avoid weaknesses.
Four. Personal career development opinions and views on the company next year.
Engaged in supervision work, knowing too much and too little, can never be satisfied with the present. So next year, I will ask more questions, learn more and do more, and gradually learn various professional knowledge according to the needs of my work. Abide by the company's various management systems in work and life, strengthen the cultivation of team consciousness, further integrate into our collective, use spare time to learn more norms, read more relevant papers, and improve their professional level. I also hope that the company will organize more training for our new employees so that we can better adapt to this job, so that we can do more things for the company.