Part I: Overview of the project.
1. 1 project overview
1.2 Building foundation
1.3 Relevant units and institutions
1.4 Construction site conditions
1.5 engineering geological conditions
1.6 scope of project supervision
1.7 construction quality objectives
1.8 construction progress plan
1.9 supervision service content and requirements
Part II: Instructions for Bidding
2. 1 Bidding method
2.2 Bidding Division
2.3 the scope of this tender
2.4 Qualified Bidders
2.5 bidding documents
2.6 Validity of bidding documents
2.7 tender contents
2.8 tender offer
2.9 bid bond
2. 10 tender preparation and submission
2. 1 1 bid validity period
2. 12 bid opening and evaluation
2. 13 Bid Inquiry and Bid Evaluation
2. 14 reward
2. 15 award contract (signature)
2. 16 End of bidding
The third part of the main terms of the contract
3. 1 project overview
3.2 Monitoring objectives
3.3 Supervision basis
3.4 Construction organization
3.5 Responsibilities and Rights of Party A
3.6 Responsibilities and Rights of Party B
3.7 Responsibilities and Rights of Chief Supervision Engineer
3.8 Responsibilities and Rights of the Chief Engineer's Representative
3.9 Supervision fee and payment method
3. 10 supervision fee adjustment
3. 1 1 rewards and punishment
3. 12 Liability for breach of contract and disputes
3. 13 effectiveness and termination of the contract
3. 14 Priority of contract documents
3. 15 others
The fourth part is the responsibility of project supervision.
The fifth part of the tender letter appendix
5. 1 Appendix I Tender
5.2 Annex II Authorization Certificate
5.3 Annex III Summary of Supervisors of this Project
5.4 Annex IV Summary Table of Testing Instruments and Equipment for this Project
5.5 Appendix V Resumes of on-site supervisors
5.6 Appendix 6 Analysis and Summary of Supervision Fee Quotation Part I Comprehensive Description of the Project
1. 1 project overview
1. 1. 1 project name: xx? 6? 1xx? 6? 1xx project
1. 1.2 project location: W-6 plot in xiahantou, xx city.
1. 13 project scale and content: the project covers an area of about 80.0 mu with a total construction area of about 74,000 square meters. The project is divided into two sections. The content of the project is mainly high-rise residential buildings, including multi-storey, townhouse, duplex structure and some commercial buildings. The project includes piling works, foundation works, main works, installation works, exterior decoration works, interior decoration works, outdoor underground pipelines, weak electricity, fire fighting, municipal roads and other sporadic works, with a total investment of about 80 million yuan.
1.2 Construction basis:
1.3 Relevant units and institutions
1.3. 1 Employer: xx Branch of xxxx Real Estate Development Co., Ltd.
1.3.2 Designer: First Architectural Engineering Design Institute of China United Engineering Company.
1.3.3 Geological exploration unit: xx Urban Construction Surveying and Mapping Brigade.
1.3.4 construction unit: to be determined.
1.3.5 quality supervision organization: xx quality inspection station.
1.3.6 tendering and bidding management institution: xx tendering office.
1.4 site conditions: earthwork is under way, site fence has been completed, and water and electricity have been connected.
1.5 engineering geological conditions: see the geological report for details.
1.6 project supervision scope: the project is divided into two sections, with high-rise residential buildings as the main content, including multi-storey, row houses, duplex structures and some commercial buildings. The project contents include piling, foundation engineering, principal part engineering, installation engineering, exterior wall decoration engineering, interior decoration engineering, outdoor underground pipelines, weak current, fire fighting, municipal roads and other sporadic projects.
1.7 construction quality objective: to reach the excellent project acceptance standard.
1.8 construction schedule:
Construction stage: 20001oct 00 -20001oct 00.
1.9 supervision service content and requirements
1.9. 1 The supervision services of this project include: adopting scientific methods and means to control the investment, quality and construction period of the project, coordinating the relationship between relevant units, submitting complete supervision documents to the owner, and participating in the disclosure, completion acceptance and final accounts audit of the project.
1.9.2 The supervision service period of this project starts from the date of signing the contract and ends when the project passes the completion acceptance and delivery. However, during the project quality warranty period, the supervision unit shall bear the corresponding obligations and responsibilities.
1.9.3 the supervision unit must supervise in strict accordance with the relevant national and provincial regulations on construction supervision.
1.9.4 The inspection and test of bulk materials and major and important materials used by the supervision unit must be synchronized with the construction unit and carried out independently, and any inspection data and test equipment of the construction unit shall not be used. In case of detection expenses, it shall be reported to Party A in advance, and settled according to relevant agreements after the consent of Party A's representative.
1.9.5 The supervision unit shall not have an economic interest relationship with the construction contractor and material and equipment supplier undertaking this project.
Instructions to Bidders Part II
2. 1 Bidding method
In order to strengthen the management of this project, improve the level and quality of engineering construction, effectively control the investment and construction period, and give full play to the investment benefit, the project supervision unit is selected through public bidding according to the Contract Law of People's Republic of China (PRC) and the relevant provisions of bidding and tendering, and in accordance with the principles of "openness, fairness, impartiality" and honesty and credit.
2.2 Bidding Division
The first phase of the project is divided into two blocks.
2.3 the scope of this tender
See article 1.6 for the scope of this tender.
2.4 Qualified Bidders
2.4. 1 has the qualification grade and independent legal person qualification, has contracted similar engineering supervision business, and has no business interests with construction contractors and suppliers of materials and equipment, with good performance and reputation.
2.4.2 Should have sufficient resources and ability to effectively perform the contract.
2.4.3 The bid registration unit that received the letter of acceptance.
2.5 bidding documents
2.5. 1 tender documents:
(1) Letter of Acceptance;
(2) See the attached table for instructions to bidders;
(3) Contents of the first to fifth parts of this document;
(4) Supplementary bidding documents (if any).
In addition to the contents listed above, any oral explanation, introduction and reply of any staff member of the owner unit to the bidder can only be used for the bidder's reference and is not binding on the owner and the bidder.
2.5.2 Modification of bidding documents
(1) The bidder shall carefully read and correctly understand the provisions and requirements of various clauses in the bidding documents, including the instructions to bidders. If you find any mistakes, omissions or ambiguous words, please ask the owner to clarify them in writing before10.00.
(2) The owner will organize the bidders and relevant units to visit the construction site according to the time specified in the schedule before the instructions to bidders, and introduce the relevant situation in and around the site for reference. And hold a bidding question-and-answer meeting (pre-bidding meeting) to uniformly answer the questions raised by the tendering unit in understanding the bidding documents, drawings and on-site reconnaissance;
(3) The owner's official reply to all questions will be sent to all bidders who have obtained the bidding documents in the form of supplementary bidding documents, but the source of inquiry is not stated;
(4) Two days before the bidding deadline, for various reasons, the owner can modify the bidding documents in the form of supplementary bidding documents, whether by himself or in response to the bidder's clarification requirements.
2.6 Validity of bidding documents
The tender documents are the effective basis for this tender, and also the basis for signing the supervision contract after winning the bid, which is binding on both parties to the tender. Anyone who does not conform to the substantive contents of the bidding documents will be rejected or deemed invalid.
2.7 tender contents
2.7. 1 Bid (Annex I).
2.7.2 Supervision qualification certificate, business license (copy), other credit information and other supporting materials.
2.7.3 Introduction or certification materials and awards of similar project supervision achievements in recent years.
2.7.4 Supervision Outline:
(1) Overview of this supervision project;
(2) the content and basis of supervision work;
(3) the organizational structure of the project supervision management team;
(4) Summary table of chief supervision engineer, chief supervision engineer's representative, supervision engineer and supervision personnel, introduction of performance, experience, ability, qualification certification materials and chief supervision engineer's arrival rate commitment (Annex 4);
(5) The main means and measures of project quality, progress and investment control;
(6) Safety and civilized construction supervision and management measures;
(7) Work arrangement and mobilization plan of supervisors;
(8) Work rules of supervisors;
(9) Summary table of testing instruments, meters, equipment and vehicles put into this project (Annex 5);
(10) Opinions on the implementation supervision of this project.
2.7.5 Suggestions and requirements to the owner and commitment opinions to relevant clauses in the bidding documents.
2.7.6 Power of Attorney of Chief Supervision Engineer.
2.7.7 General supervision engineer candidate preparation, experience and performance and other materials.
2.7.8 Supervision fee quotation (including: quotation description, compilation basis, cost standard, cost analysis, quota reduction and reasons, final supervision quotation, conditions and methods for adjusting supervision service fee, and other explanations). (Annex VI)
2.7.9 The bid bond can be in the form of cash, transfer check or bank draft.
2.7. The power of attorney signed by the legal representative of10 authorizing the bidding of this project. (Annex II)
2.7. 1 1 bidding application and other materials.
2.8 tender offer
2.8. 1 The bidder shall make competitive quotation according to the bidding documents, drawings and materials provided by the owner, the scope and content of supervision, relevant national charging standards, and the investment of its own supervision ability and supervision force.
Problems to be considered in the production of work resume-resume structure analysis
The structure of resume largely ref