Current location - Education and Training Encyclopedia - Graduation thesis - Catalogue of training materials for cost personnel of water conservancy and hydropower projects
Catalogue of training materials for cost personnel of water conservancy and hydropower projects
Chapter 1 Introduction

Section 1 Overview of Engineering Construction

I. Engineering construction

Second, the engineering construction project

Three. Life cycle of engineering construction project

Four, the classification of engineering construction projects

Verb (abbreviation of verb) division of engineering construction projects

Six, the construction procedures of engineering construction projects

Seven. Construction procedure and project cost system

Section 2 Foundation of Project Cost

I. Overview of Project Cost

Second, the project cost management

The third quarter project cost valuation

A, the principle of project cost valuation

Second, the project cost valuation method

Third, the project cost pricing model

Fourth, the characteristics of the project cost valuation

Five, the project cost valuation basis

Six, the principle of project cost valuation

Section 4 Composition of Cost Items of Water Conservancy and Hydropower Projects

I. Project Composition

Second, the project division

Chapter II Drawings of Water Conservancy and Hydropower Projects

Section 1 General Provisions

First, the drawing format.

Second, the title bar and countersign bar.

Third, the scale of surveying and mapping

Fourth, the drawing font

The second water-saving construction drawing

I. General Provisions on Drawing of Hydraulic Structures

Second, the hydraulic construction and construction drawing

Section 3 Hydraulic Mechanical Diagram

A schematic diagram of the types of hydraulic machinery

Second, the hydraulic machinery diagram graphic symbols

Three, hydraulic machinery drawing equipment materials

Four, the drawing of hydraulic machinery diagram

Five, hydraulic machinery drawing standards

Chapter III Cost Composition of Water Conservancy and Hydropower Projects

The first section project cost

First, the construction and installation costs

Second, the equipment cost

Section 2 Independent expenses

I. Construction management fee

Second, the production preparation fee

Three, scientific research survey and design fees

Four, building and construction site expropriation fees

Verb (short for verb) others

Section 3 Reserve Funds and Financing Interest during Construction Period

First, the reserve fund.

Second, the construction period financing interest

Chapter IV Determination of Base Price of Water Conservancy and Hydropower Projects

Section 1 Unit Price of Labor Budget

First, the composition and calculation of labor budget unit price

Second, the calculation standard of labor budget unit price

Section 2 Budget Price of Materials

I. Budget price of main materials

Second, other materials budget price

Section 3 Usage Fee for Construction Machinery

I. Depreciation expenses

Second, the cost of major repairs

Third, the cost of regular repairs.

4. Demolition fee and off-site transportation fee

Verb (abbreviation for verb) Fuel and electricity costs

Six, labor costs

Seven, vehicle and vessel use tax

The fourth quarter construction electricity, wind, water budget price

I. Composition of Budget Price and Expenses

Second, the price of electricity for construction

Third, the building wind price

Fourth, the construction water price

Section 5 Unit price of aggregate and concrete materials

I. Total unit price

Second, the unit price of concrete materials

Chapter V Quota System for Water Conservancy and Hydropower Projects

Section 1 Overview of Quota

First, the concept of quota.

Second, the role of quota.

Third, the characteristics of the quota

Fourthly, the classification of quota.

Section 2 Quota Compilation of Water Conservancy and Hydropower Projects

A, the preparation of construction quota

Second, the preparation of budget quota

Third, the preparation of budget quota

Fourth, the establishment of enterprise quota

Section 3 Quota Application of Water Conservancy and Hydropower Projects

First, the manifestations of water conservancy and hydropower engineering quota

Second, the composition of water conservancy and hydropower engineering quota

Three, water conservancy and hydropower engineering quota project content

Four, water conservancy and hydropower engineering quota application instructions

Five, water conservancy and hydropower engineering quota application example

Section 4 Quota Valuation of Water Conservancy and Hydropower Projects

First, the composition and compilation of the preliminary design budget documents of water conservancy projects

Second, the quota valuation method of water conservancy and hydropower projects

Third, the division of project budgeting

Four, the preparation of the total budget of water conservancy projects

Chapter VI Valuation with Bill of Quantities of Water Conservancy Projects

Section 1 Specification for Valuation of Bill of Quantities of Water Conservancy Projects

Brief introduction of valuation standard of bill of quantities for water conservancy projects

Second, the preparation of the bill of quantities

Third, the bill of quantities valuation

Fourth, the bill of quantities and its pricing format

Five, the bill of quantities quotation sheet to fill in

In the second quarter, the Model Contract is about the valuation of bill of quantities.

A, "contract model" about the content of the bill of quantities

Two, the "model contract" on the measurement and payment of quantities.

Chapter VII Calculation of Design Quantity of Water Conservancy and Hydropower Projects

Section 1 General Provisions

In the second quarter design engineering quantity calculation rules

A, permanent engineering construction quantity calculation

Second, the construction of temporary works quantity calculation

Third, the structural engineering quantity calculation

Chapter VIII Calculation of Quantities for Quota Valuation of Water Conservancy and Hydropower Projects

Section 1 Calculation of Quantities for Quota Valuation of Water Conservancy Construction Projects

A, earthwork excavation engineering

Second, the stone excavation project

Three. Earthwork filling engineering

Fourth, concrete engineering

Five, template engineering

VI. Sand and gravel preparation project

Seven, drilling grouting and anchoring engineering

Eight. dredging work

IX. Other projects

Section 2 Calculation of Quantities for Quota Valuation of Water Conservancy and Hydropower Equipment Installation Project

A, steam turbine installation

Second, the hydro-generator installation

Three. Installation of large water pump

Fourth, the water inlet valve installation

Five, hydraulic machinery auxiliary equipment installation

Six, electrical equipment installation

Seven, substation equipment installation

Eight, communication equipment installation

Nine, electrical adjustment

X. Installation of lifting equipment

XI。 Gate installation

Twelve. Manufacture and installation of penstock

Thirteen. Field transportation of equipment

Chapter IX Calculation of Quantities List Valuation of Water Conservancy Projects

Section 1 Calculation of Quantity of Water Conservancy Construction Project

1. Earthwork excavation (code: 500 10 1)

Second, the stone excavation project (code: 500 102)

Three. Earthwork Filling Project (code: 500 103)

4. Dredging and reclamation project (code: 500 104)

Verb (abbreviation of verb) masonry engineering (code: 500 105)

Vi. Bolting and shotcreting support project (code: 500 106)

Seven. Drilling grouting project (code: 500 107)

Eight. Foundation seepage control and foundation reinforcement project (code: 500 108)

IX. Concrete Engineering (Code: 500 109)

X. formwork engineering (code: 500 1 10)

Xi。 Processing and installation of steel bars and steel members (code: 500 1 1 1)

12. Precast concrete works (code: 500 1 12)

Thirteen. Raw material mining and processing engineering (code: 500 1 13)

Fourteen Other construction projects (code: 500 1 14)

Section 2 Calculation of Engineering Quantity of Water Conservancy Installation Project

I. Mechanical and electrical equipment installation project (code: 50020 1)

Second, the metal structure equipment installation project (code: 500202)

Three. Procurement and installation of safety monitoring equipment (code: 500203)

Section 3 Measurement and Payment of Bill of Quantities

A, earthwork excavation engineering measurement and payment

Second, the measurement and payment of stone excavation engineering

Three, earthwork filling engineering measurement and payment

Four, dredging and reclamation engineering measurement and payment

Five, the measurement and payment of masonry engineering

Measurement and payment of bolting and shotcreting support project with intransitive verb

Seven, drilling and grouting engineering measurement and payment

Measurement and payment of foundation seepage control and foundation reinforcement works

Nine, the measurement and payment of concrete engineering

X. Measurement and Payment of Formwork Project

XI。 Measurement and payment of reinforcement and anchor engineering

Chapter X Bidding for Water Conservancy and Hydropower Projects

Section 1 Overview

First, the concept of construction project bidding

Second, the principle of project bidding

Third, the significance of project bidding

Fourth, the characteristics of project bidding

Section 2 Bidding for Water Conservancy and Hydropower Project Construction

I. Bidding documents

Second, the bidding method

Third, don't bid for the project

Four. Bidding procedure

Section 3 Bidding

Section 4 Bid Opening, Bid Evaluation and Bid Winning

I. Bid Opening

Second, bid evaluation

Third, winning the bid

Appendix Division of Water Conservancy Capital Construction Projects

refer to